Tuesday, October 31, 2006

Structurally Insulated Panels - SIPs

The Euclid crew is putting up the SIPs walls and I (Paul) am following behind them framing the second floor. The large openning is for the front door. The dining room is in the center of the photo with two doors flanking a post. Posted by Picasa

Tuesday, October 10, 2006

View From the Library

I stood on some beams in the left-center of the library to get this shot. Posted by Picasa

View from South Hill

I climbed up the hill behind the house (opposite side of the home as the driveway) to get this perspective. Two more bents have been added to the back of the home (greatroom), which are shown in this view. Posted by Picasa

Right Bents Go Up


Today Euclid began working on the right side of the home. Posted by Picasa

Tuesday, October 03, 2006

Cupola In Place

This picture is taken from up the hill in the front yard. We have reached total height. Posted by Picasa

A Crowning Accomplishment

The Euclid crew raises the Cupola. Posted by Picasa