Friday, July 27, 2007

Snow Shield

Do to the snow accumulation at the back door this past winter, we are adding a small timber frame porch.
Posted by Picasa

Roof and Windows

The roof is complete! All windows (except the cupola) are installed. The 'pool' ,in the left front of the picture, is being used to store water as we 'clean up' the well.
This picture, taken earlier then the one above, shows the framing of the left deck.
Current view up the canyon.
Posted by Picasa

Pump in the well

The 5 horse power pump is being lowered into the well (set just below 500 feet).
Posted by Picasa