Saturday, May 12, 2007

Stoned!

One of the challenges with building on a mountain slope is the need to retain the steep cut banks. The tree in the left-center of the picture sits about 13 feet above the front yard. We have built two waterfalls (upper right and lower left corner of openning below the timber frame bent and rock stairs (center and far right of view). The waterfalls connect to a stream that will eventually make its way to a 1/2 acre pond that will be built in the canyon floor.






No comments: